美女脱了内裤张开腿让男人桶网站,国产又黄又粗又猛又大AA片,噜噜噜亚洲色成人网站,少妇高潮惨叫久久久久电影69

Chaosheng bathroom teaches you the installation precautions of shower!
  • Date:2023-02-25
  • Read:2142
1. The distance between the cold and hot water outlets is 13-15 / cm and parallel and vertical. The constant temperature shower requires that the water outlet must be hot on the left and cold on the right. The water outlet shall not be concave into the ceramic tile surface for more than 0.5cm.
2. Drain the water for 15 seconds and clean the sediment and impurities in the pipeline to avoid blocking the valve core.
3. When installing the main body, pay attention to check whether there is 6 sealing water gasket. Cushion cloth must be used when fixing the nut to prevent scratching the surface
Prev

What are the general types of faucet materials?

Next

Purchasing skills of fabricated bathroom